Odense low-floor articulated tram 01 "Brunneren"
OperationalThe history of the tram
Odense Letbane
Operational
March 2020: Delivered as Odense low-floor articulated tram 01 "Brunneren", manufacturer Stadlerrail Werk Pankow, series 01-16, width 2.65 m, length 42.00 m, manufactured 2020.
Odense Light Rail's design: Train sets and accessibilityBy Odense Letbane.
April 20, 2018.
April 20, 2018.
Odense low-floor articulated tram 01 "Brunneren" at Kontrol centret (2020)By Henrik Boye.
March 12, 2020.
March 12, 2020.
Odense low-floor articulated tram 01 "Brunneren" at Kontrol centret (2021)By Henrik Boye.
March 17, 2021.
March 17, 2021.
Odense low-floor articulated tram 01 "Brunneren" in front of Kontrol centret (2021)By Henrik Boye.
March 17, 2021.
March 17, 2021.
First test run with the light rail in the city centreBy Odense Letbane.
August 28, 2021.
August 28, 2021.
Jarl Abrahamsen from Byforening Odense on the light rail's architectural significanceBy Odense Letbane.
January 19, 2022.
January 19, 2022.
Why have light rail systems become popular?By Odense Letbane.
March 16, 2022.
March 16, 2022.
The light rail in OdenseBy NoahsTrainsDK.
May 14, 2022.
May 14, 2022.
Inauguration of Odense Light RailBy Kennys Film.
May 28, 2022.
May 28, 2022.
Odense Tramway with low-floor articulated tram 01 "Brunneren" at Vestre Stationsvej (2022)By Henrik Boye.
July 4, 2022.
July 4, 2022.
Odense Tramway with low-floor articulated tram 01 "Brunneren" at Bolbro (2022)By Henrik Boye.
October 17, 2022.
October 17, 2022.
Most viewed video - January 2023
Trip with Odense Light Rail 3 March 2023By Hans Jørgen Hansen.
March 3, 2023.
Trip with Odense Light Rail 3 March 2023By Hans Jørgen Hansen.
March 3, 2023.
Napkins holder: Odense Tramway with low-floor articulated tram 01 "Brunneren" inside Kontrol centret (2023)By Henrik Boye.
November 11, 2023.
November 11, 2023.